Skip to main content
DeltaSolv
Customer Stories

Built for the field. Proven on billion-dollar projects.

See how EPC teams use DeltaSolv to capture change events, track equipment, and build unassailable audit trails.

14,225Change events tracked
$20.9MRework value captured
9,348Equipment items managed

Trusted by EPC teams

  • Horizon Tower
  • Meridian Energy
  • Coastal LNG
  • Summit EPC
  • Apex Industrial
  • Vanguard Construction

What our customers say

Construction back-charge documentation site
100% capture rate

We went from losing $800K per quarter in undocumented back-charges to capturing every single one with timestamped evidence.

James Rivera

VP of Construction, Horizon Tower

Equipment tracking on construction site at night
30s average capture time

DeltaSolv replaced three separate spreadsheet systems. Our field teams now document change events in under 30 seconds.

Sarah Chen

Project Controls Manager, Meridian Energy

Remote pipeline construction site operations
Works offline, syncs later

The offline capability was the deciding factor. Our remote pipeline sites have zero connectivity, and DeltaSolv just works.

Michael Torres

Field Operations Lead, Coastal LNG

Case Studies

Results from the field.

Petrochemical
$800K/qtr

Back-Charge Recovery at Scale

A Gulf Coast petrochemical contractor eliminated $800K per quarter in undocumented back-charge write-offs by switching from paper logs to DeltaSolv. Every deviation is now captured at the point of event with timestamped photo evidence.

Power Generation
2,000+ items

Equipment Tracking for 2,000+ Items

A power plant construction team deployed DeltaSolv to manage GPS-tagged check-in/out for 2,200 equipment items across four contractor zones. Asset disputes dropped to zero in the first quarter.

Pipeline
Zero connectivity

Offline-First Documentation in Remote Sites

A pipeline contractor working in remote terrain with no cell coverage uses DeltaSolv offline-first mobile to document change events and equipment status. All data syncs automatically when crews return to connectivity range.

See what effortless documentation looks like on your site

30-minute demo with a construction operations specialist. No sales pitch.

Or email us at hello@deltasolv.com

DeltaSolv construction site documentation in action